“Expedite confront reality early, removing cost and time risk.”
Rather than building everything on-site, Expedite fabricated the bridge and lift shaft off-site. Components arrived ready to install, and within days, the structures were lifted into position. This approach allowed the hospital to remain operational, even during the short, on-site construction phase.
Early Partnership Delivers Significant Savings
Expedite was engaged early to develop the feasibility study and business case, identifying priority works and establishing a staged delivery approach focused on life safety.
Early contractor involvement enabled close collaboration with engineering specialists, resulting in an alternative seismic bracing solution that delivered substantial cost savings while maintaining structural resilience.
Efficient Connection of Two Live Facilities
Connecting two operational hospital buildings required careful planning and coordination. Detailed health planning confirmed a link bridge as the most effective solution, maximising functionality across both facilities.
To minimise disruption, the bridge and lift shaft were prefabricated off-site and delivered ready for installation. The structures were lifted into place within days, significantly reducing on-site construction activity and allowing hospital operations to continue uninterrupted.



$ M
What we delivered
Expedite completed an upgrade of Southern Cross’s Wellington Hospital, including refurbishment of Theatre 6, expansion of CSSD, seismic strengthening of the existing structure, canopy replacement, and installation of the new link bridge. The project’s success was due to meticulous planning, innovation and genuine care for the people who rely on the facility every day.
Expedite completed an upgrade of Southern Cross’s Wellington Hospital, including refurbishment of Theatre 6, expansion of CSSD, seismic strengthening of the existing structure, canopy replacement, and installation of the new link bridge. The project’s success was due to meticulous planning, innovation and genuine care for the people who rely on the facility every day.
Expedite completed an upgrade of Southern Cross’s Wellington Hospital, including refurbishment of Theatre 6, expansion of CSSD, seismic strengthening of the existing structure, canopy replacement, and installation of the new link bridge. The project’s success was due to meticulous planning, innovation and genuine care for the people who rely on the facility every day.